Dace Price Booklet logo

F2003. Pipe bridge

Steel, truss pointer pipe bridges.

Span width max. 15 m.

Steel construction (not fire proofed) painted.

Including:

  • Pile foundation;

  • Provisions for cable trays.

Excluding:

  • Treating and dumping cost of contaminated ground;

  • Exploratory trench excavation;

  • Provisions for underground infrastructure;

  • Walkway on pipe bridge;

  • Provisions for extension in the future;

  • Terrain finishing.

Sign in to access this content

Please sign in to your account to view this information.