F1001. Industrial buildings (manufacturing and workshop buildings)
a. More than 1 floor level and minimum building volume 5,000 m3.
b. Single floor and minimum height of building 7 m.
Concrete or steel framed construction.
Bare building
Excluding:
Heating;
Air conditioning;
Lighting;
Pile foundation;
Asset provisions.
Basic installation
Including:
Heating;
Air-conditioning;
Lighting.
Excluding:
Pile foundation;
Asset provisions.
Extensive basic installation
Including:
Heating;
Air-conditioning;
Lighting;
Asset provisions.
Excluding:
Pile foundation;
Furniture.