F4009. Pile foundations
Minimum number of 50 piles.
Including:
- (Revised) calculations, - drawings, piling plan;
- Measuring and setting out;
- Reinforcement and earthing bars;
- Removal of drilling mud and contaminated ground;
- Acoustic measuring;
- Piles cutting and removal of pile cutoffs.
Excluding:
- Excavation and test trenches;
- Dock plates, fencing etc.